Trinity Structures achieves a 4-month off-grid electrification at Costco’s Mira Loma center, California, challenging the norm with a rapid deployment in contrast to the standard 24-month timeline. The integrated modular ecosystem offers a comprehensive solution for design, construction, deployment, and ongoing support and addresses challenges faced by fleet owners dealing with regulatory constraints and grid limitations. . The electrified structures generates, converts, and conducts solar energy.
Costco’s Mira Loma center electrified in record time by Trinity Structures
Costco, aiming for alternative fuel models by 2035, sought Trinity as an end-to-end electrification partner for speed-to-market solutions. Image Credit Trinity Structures.