Sunday, July 7, 2024

Arctech partnered with L&T for 1.7 GW PV project in Saudi Arabia 

Arctech bags order for two PV projects, 1.3 GW AR RASS2 and 408 MW Al Kahfah in Saudi Arabia, from EPC giant L&T. Both the projects utilize it’s SkyLine II solar tracking system from Arctech. The SkyLine II solar tracking system features multi-point drive design enabling operation at wind speeds up to 22 m/s, AI algorithms enhancing yield by 8%, thereby lowering costs.  

RELATED ARTICLES
QR code whatsapp
Scan & stay connected!
Get updates on WhatsApp

Most Popular