Costco’s Mira Loma center electrified in record time by Trinity Structures

Trinity Structures achieves a 4-month off-grid electrification at Costco’s Mira Loma center, California, challenging the norm with a rapid deployment in contrast to the standard 24-month timeline. The integrated modular ecosystem offers a comprehensive solution for design, construction, deployment, and ongoing support and addresses challenges faced by fleet owners dealing with regulatory constraints and grid limitations. . The electrified structures generates, converts, and conducts solar energy.