LONGi’s Serendah module fab begins operations in Malaysia

  • LONGi completes its PV value chain in Malaysia with Serendah Module Plant.
  • The plant took a year to build and equip, spanning 140 acres of land.
  • It enhances LONGi’s capacity, with 2.8 GW in phase I and 6 GW in phase II.
  • Replacing Kuching facility, the fab reinforces LONGi’s presence outside China.

Leave a Reply