Germany-headquartered Encavis AG, in collaboration with BELECTRIC, commissioned the 114 MW Borrentin solar park. The project increased Encavis’ total grid-connected renewable energy capacity in Germany to 700 MW. Built in a short timeline, it spans an area equal to 135 football fields. The park generates 121 GWh of green electricity annually. The clean energy supports Allego’s EV charging network under a 10-year PPA. It contributes to Germany’s renewable energy and sustainability goals.
Encavis commissions 114 MW Borrentin solar park in Germany
Borrentin project contributes 121 GWh annually, powering Allego’s EV charging network under a 10-year PPA. (Image Credit/Source:MRganso/Pixabay)