/solarbytes/media/media_files/2025/02/17/L1dWXG65XmpqSSYwp30X.png)
Sineng Electric supplied 184 units of its 3.3 MW central inverters (EP-3300-HB-UD), achieving a total capacity of 606 MW AC. Image Source: Sineng Electric
China-Headquartered Sineng Electric has commissioned a 661 MW AC (925 MWp) solar project in Kurnool, Andhra Pradesh, as part of ArcelorMittal Nippon Steel India’s 975 MW hybrid renewable energy system. The project includes 661 MW of solar and 314 MW of wind power. Sineng Electric supplied 184 units of its 3.3 MW central inverters, delivering 606 MW with up to 99% efficiency and provided comprehensive on-site engineering support. These EP-3300-HB-UD inverters operate without derating at 51ºC, ensuring optimal energy yield and grid compliance. In India, Sineng Electric has recently energized a 641 MW solar installation at Gujarat’s Khavda Solar Park.