Kosol Energie installs GoodWe tech in GSECL’s 10 MW Kutch project

GoodWe has supplied 350 kW inverters for a 10 MW GSECL project by Kosol Energie in Kutch, which has delivered 70 MWh/day and outperforming prior models by 10-15%.

New Update
According to Kosol Energie, GoodWe’s inverters have delivered 10–15% more output than earlier models used.

According to Kosol Energie, GoodWe’s inverters have delivered 10–15% more output than earlier models used. Image Source: GoodWe

GoodWe, a China-based solar inverter and energy storage manufacturer, has supplied 350 kW GW350KH-UT inverters for a 10 MW project in Kutch, Gujarat. The project was developed by Kosol Energie for Gujarat State Electricity Corporation Limited and is located in a high-temperature region. According to Kosol Energie, GoodWe’s inverters have delivered approximately 70 MWh of energy daily under extreme environmental conditions. Kosol Energie said the output was 10–15% higher than other inverters previously used in similar settings. The inverters were chosen for high-temperature performance and have consistently supported stable output since installation. GoodWe confirmed all operational benchmarks were met. 

Advertisment {'id': '68001afbb15d0a527be6c257', 'source_name': 'GoodWe', 'source_link': 'https://en.goodwe.com/kosol-energie-powers-10-mw-solar-project-in-kutch-with-goodwe-inverters', 'contact_name': 'GoodWe', 'contact_email': '[email protected]'}
Advertisment

Scan to join our channel

QR Code
Latest Stories