Jindal Stainless & AB Energia commission 30 MW solar project in Odisha

AB Energia & Jindal Stainless has commissioned a 30 MW solar project in Jajpur, Odisha, including a rooftop and floating systems, cutting 32,208 tons CO₂ annually.

New Update
The 7.3 MW floating solar system has been deployed on an internal reservoir to reduce water loss and boost solar yield.

The 7.3 MW floating solar system has been deployed on an internal reservoir to reduce water loss and boost solar yield. Image Source: Pixabay

India -based Jindal Stainless and AB Energia Solutions Pvt. Ltd. have completed a 30.34 MW solar energy project at the Jajpur manufacturing unit in Odisha. The system includes a 7.324 MW floating solar installation on a reservoir and a 23.02 MW rooftop solar setup across 10 industrial roofs. Designed to operate within a single industrial campus, the plant is expected to produce around 44.3 million units of electricity annually. This output can offset approximately 32,208 metric tons of CO₂ emissions each year. The floating solar section is positioned to utilise unused water surfaces while also helping reduce evaporation. The project decreases the site's reliance on conventional grid electricity by incorporating multiple solar technologies across available structural and water spaces. 

Advertisment {'id': '680880934fa0b3833b26b925', 'source_name': 'Jindal stainless', 'source_link': 'https://www.jindalstainless.com/wp-content/uploads/2025/04/V3-22.04.2025_PR-Jindal-Stainless-and-AB-Energia.pdf', 'contact_name': 'Abhishek Dutta', 'contact_email': '[email protected]'}
Advertisment

Scan to join our channel

QR Code
Latest Stories