Jinko Power Technology signs a 25-year PPA with Saudi Power Procurement Company for the 400 MW Tabarjal PV Project under NREP Round 4. Located 17 km from Tabarjal, the project utilizes bifacial solar panels for increased efficiency. Construction spans between 2024 and 2025, aiming to significantly cut KSA’s CO2 emissions by over 717,000 metric tons annually.
Saudi Power’s 25-Year deal with Jinko Power
With Tabarjal and Saad projects, JinkoPower shall own 700MW in the Saudi Arabia. Illustration by Jinko.