Back-contact modules outperform TOPCon in 47 MW Seville project

A Seville field study by Enertis Applus+ found LONGi's Hi‑MO 9 BC modules delivered 2.4 - 3.4% higher yield and 3.92 - 4.47% lower LCOE than TOPCon.

author-image
By Karthik Srivasthav G
New Update
The energy yield per watt has shown a 2.4 to 3.4% advantage when using Hi‑MO 9 modules compared to TOPCon modules

The energy yield per watt has shown a 2.4 to 3.4% advantage when using Hi‑MO 9 modules compared to TOPCon modules. Image Source: PRNewswire

Enertis Applus+, a Spain-based solar technical advisor, has conducted a commercial assessment of LONGi’s Hi-MO 9 back-contact modules in a 47MW single-axis tracker project located in Seville. According to Enertis Applus+, the Hi-MO9 modules achieved 2,209 full-load hours in the first year, offering a 2.4 to 3.4% higher energy yield per watt compared to TOPCon modules. Although LONGi’s modules carried a €0.007 (~ $0.008) per watt pricing premium, Enertis Applus+ stated that total system CAPEX was comparable due to improved system design. The modules recorded a levelized cost of electricity of €0.02706 (~ $0.03085) /kWh, which was 3.92 to 4.47% lower than TOPCon. Enertis Applus+ noted that this LCOE benefit resulted from greater energy output, better tracker compatibility, and reduced electrical losses in operational performance. 

Advertisment {'id': '684934f601c8130d6ba3a42d', 'source_name': 'PRNewswire', 'source_link': 'https://www.prnewswire.com/in/news-releases/enertis-applus-study-longi-bc-modules-outperform-topcon-in-lcoe-driving-higher-commercial-value-302477457.html', 'contact_name': 'LONGi', 'contact_email': '[email protected]'}
Advertisment

Scan to join our channel

QR Code
Latest Stories