Germany based RENA Technologies has signed contract with CELLORAA ENERGY PRIVATE LIMITED to supply advanced wet chemical processing systems for a 1.2 GW TOPCon solar cell manufacturing line in Surat, Gujarat. The project marks the first TOPCon manufacturing facility of its kind in the state. The partnership began with a handshake at the TaiyangNews Solar Technology Conference India 2026 in Delhi and was formalized on February 24, 2026. RENA will deliver InEtchSide 4+ and N600 batch platforms to support high-efficiency TOPCon cell production, scheduled for the end of FY 2026-27. The equipment is engineered to cut water use and wastewater by around 50% and operates without H₂O₂ in key steps. CELLORAA will leverage RFL water-capping technology and receive local support from IMC, Mumbai. Both companies are also preparing an MOU to advance water-saving processes and next-generation cell concepts including IBC.
RENA & CELLORAA sign 1.2 GW TOPCon Surat deal
CELLORAA ENERGY PRIVATE LIMITED signed a contract with RENA Technologies for 1.2 GW TOPCon wet processing tools in Surat, Gujarat, with IMC Mumbai support.
/solarbytes/media/media_files/2026/02/27/2026-02-27-rena-pr-2026-02-27-17-42-00.jpeg)
Advertisment
/solarbytes/media/agency_attachments/2025/01/13/2025-01-13t112055287z-solarbytes.png)
/solarbytes/media/agency_attachments/2025/01/13/2025-01-13t112030439z-solarbytes.png)