Maharashtra State Power Generation Co. Ltd., an India-based power generation utility, has invited online bids for an EPC package for a 50 MW AC grid-connected PV project in India. The tender includes design, engineering, erection, testing, commissioning, and construction of Balance of System works to the ground-mounted PV project located at Parli in Beed district. The scope has excluded the supply of PV modules, IDT, and central inverters. The contract also includes operation and maintenance for a period of seven years. Power evacuation systems up to the MSETCL STU substation are included within the scope. Tender document downloads have commenced on January 19, 2026 and the project site visits are scheduled between January 19, 2026, and February 4, 2026. The tender online submissions will close on March 10, 2026 with the techno-commercial bids scheduled to be opened on March 10, 2026.
MAHAGENCO opens bidding for 50 MW AC Parli PV installation
An online tender has been issued by Maharashtra State Power Generation Co. Ltd. for EPC BoS execution of a 50 MW AC ground-mounted grid-connected PV project in India.
/solarbytes/media/media_files/2026/01/20/2026-01-20-mahagenco-gks-2026-01-20-18-52-59.jpg)
Advertisment
/solarbytes/media/agency_attachments/2025/01/13/2025-01-13t112055287z-solarbytes.png)
/solarbytes/media/agency_attachments/2025/01/13/2025-01-13t112030439z-solarbytes.png)