India-based power producer, JSW Energy has added 261 MW of renewable energy capacity, comprising 189 MW of solar and 72 MW of wind projects. With this, the company’s total installed capacity reached 12.760 GW, with 56 % coming from hybrid renewable sources. The cumulative capacity addition during the June quarter stood at 1.9 GW, covering both organic and inorganic projects. The company’s total locked-in generation capacity stands at 29.9 GW, which includes 12.8 GW operational, 12.5 GW under construction, and 4.6 GW in the project pipeline.