ACME Solar Holdings, an India-based renewable energy developer, has secured a 220 MW solar project with a BESS from Rewa Ultra Mega Solar Ltd (RUMSL). The award is part of a 440 MW tender floated by RUMSL for the Morena Solar Park in India. The project is required to supply power with a maximum annual Capacity Utilisation Factor of 35% and 4 hours of peak supply, including 2 hours in the morning and 2 hours in the evening, at 95% annual availability. Charging energy for the evening peak will be sourced from the solar plant to BESS, while energy for the morning peak will be supplied free of cost by the procurer during night hours. RUMSL will provide the land and evacuation infrastructure above the 33 kV level. A 25 year PPA for the project will be signed with Madhya Pradesh Power Management Company Ltd and RUMSL.