Israel’s Enlight Renewable Energy, through its US subsidiary Clenera, signed a 20-year Power Purchase Agreement (PPA) with Arizona Public Service (APS) for its Snowflake A project. The project, located near Holbrook, Arizona, will include 600 MW of solar power generation and 1900 MWh of energy storage. Currently in the final stages of pre-construction permitting, Snowflake A is expected to reach ready-to-build status by Q3 2025 and begin operations by mid-2027. The PPA includes a termination clause if certain permits are not obtained by March 2025. The project is part of Enlight’s “Connect and Expand” strategy, leveraging existing infrastructure to reduce costs.
Enlight’s Clenera signs 20-year PPA for 600 MW Snowflake project in Arizona
The Snowflake A solar project, located near Holbrook, Arizona, is expected to begin operations by mid-2027. (Image Credit/Source:Coernal/Pixabay)