Germany-headquartered Encavis AG, in collaboration with BELECTRIC, commissioned the 114 MW Borrentin solar park. The project increased Encavis’ total grid-connected renewable energy capacity in Germany to 700 MW. Built in a short timeline, it spans an area equal to 135 football fields. The park generates 121 GWh of green electricity annually. The clean energy supports Allego’s EV charging network under a 10-year PPA. It contributes to Germany’s renewable energy and sustainability goals.