Onde SA, a Polish renewable energy contractor, has signed contracts to construct two photovoltaic farms for Sunly in Poland. The projects, located in the Małopolskie and Świętokrzyskie voivodeships, have a total capacity of 120 MW. The combined contract value was reported at over PLN 145 million (~$ 39.69 million). Construction is scheduled for completion in 2027. Each project included site development and preparations for future energy storage connections. Onde said that the investment aligns with Poland’s ongoing renewable energy expansion. With these additions, Onde’s total renewable portfolio has exceeded 5 GW of installed capacity.