India-based Oriana Power, has received a $2.48 million LoA from the Guyana Energy Agency for a 3 MW AC grid-tied solar project at Cheddi Jagan International Airport. The company has been instructed to design, supply, install and commission the system within a 36-month execution period, as per the agency’s award conditions. Oriana Power has stated that the contract value stands at $ 2,487,170 and supports its overseas EPC activity. The company has reported that its consolidated net profit rose 191.7%in FY 25, while net sales increased 157.8% over FY 24. Oriana Power has also noted that its shares were trading at INR 2,636(~ $29.5) after rising 0.60% on the BSE.