5B, an Australian solar pioneer, has secured a 69 MW solar contract with AES Corporation in Puerto Rico. The project includes 1,392 5B Maverick arrays, designed to endure hurricane-force winds up to 166 mph (ASCE 7-16). Shipments will begin in late 2024. The solar installation will be complemented by a 100 MW, 4-hour duration battery energy storage system. According to 5B, Maverick arrays are pre-assembled, pre-wired, and can be rapidly deployed with minimal labor.
5B to build 69 MW solar farm
AES Corporation has awarded 5B a 69 MW solar project in Puerto Rico, featuring high wind-resistant Maverick arrays. More details here.
/solarbytes/media/post_attachments/wp-content/uploads/2024/06/2024-06-7-5b-gks-scaled.webp)
Advertisment
/solarbytes/media/agency_attachments/2025/01/13/2025-01-13t112055287z-solarbytes.png)
/solarbytes/media/agency_attachments/2025/01/13/2025-01-13t112030439z-solarbytes.png)